NLSUI OPAC header image

Political and legal dimensions Indus waters treaty / (Record no. 115531)

MARC details
000 -LEADER
fixed length control field 05162cam a2200325 i 4500
001 - CONTROL NUMBER
control field 19611858
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20260219062349.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 170427s2017 pk b b 001 0 eng
010 ## - LIBRARY OF CONGRESS CONTROL NUMBER
LC control number 2017332431
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9780199403547
025 ## - OVERSEAS ACQUISITION NUMBER
Overseas acquisition number P-E-2017332431; 33; 31
037 ## - SOURCE OF ACQUISITION
Source of stock number/acquisition Library of Congress -- Islamabad Overseas Office
040 ## - CATALOGING SOURCE
Original cataloging agency DLC
Language of cataloging eng
Transcribing agency DLC
Description conventions rda
042 ## - AUTHENTICATION CODE
Authentication code lcode
-- pcc
043 ## - GEOGRAPHIC AREA CODE
Geographic area code a-pk---
-- a-ii---
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 346.046 HUS
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Hussain, Ijaz
245 10 - TITLE STATEMENT
Title Political and legal dimensions Indus waters treaty /
Statement of responsibility, etc. Ijaz Hussain.
250 ## - EDITION STATEMENT
Edition statement 1st ed.
264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Place of production, publication, distribution, manufacture Karachi :
Name of producer, publisher, distributor, manufacturer Oxford University Press,
Date of production, publication, distribution, manufacture, or copyright notice 2017.
300 ## - PHYSICAL DESCRIPTION
Extent xviii, 563 p. :
Other physical details ill. ;
Dimensions 25 cm
505 ## - Contents
Contents Introduction<br/>Chapter 1: Indus Rivers and Plains, Canal Building, and Sindh-Punjab Water Dispute<br/>A) The Indus Rivers<br/>B) The Indus Plain<br/>C) Canal Building before the British<br/>D) British and the Canal System<br/>E) Origins of Sindh-Punjab Water Dispute<br/>Chapter 2: Genesis of the Dispute<br/>A) Radcliffe Award and its Background<br/>B) Motives behind the Award<br/>C) Standstill Agreement and the Aftermath<br/>D) May 1948 Joint Statement and its Validity<br/>Chapter 3 World Bank: The Honest Broker?<br/>A) The Lilienthal Proposal and its Background<br/>B) Parties' Interests in the Negotiations<br/>C) Bank's Initiative and Start of Negotiations<br/>D) Bank Cuts the Gordian Knot<br/>E) Analysis of Pakistan's Claim to the Eastern Rivers<br/>F) Bank Dictates: Smoking Gun Evidence<br/>G) Crossing the Rubicon<br/>H) Towards a Water Treaty<br/>I) Appraisal of Ayub Khan's Role<br/>J) Bank's Motive to Side with India<br/>Chapter 4: Terms of the Treaty<br/>A) Uniqueness of the Treaty<br/>B) Safeguards for Pakistan and India<br/>C) Permanent Indus Commission<br/>D) Conflict Resolution Procedure<br/>E) Territorial Scope of the Treaty<br/>F) Miscellaneous Provisions<br/>Chapter 5 Treaty in Action-I<br/>A) Salal Dam a) History of the Dispute b) Pakistan's Objections and India's Rebuttal c) The Settlement<br/>B) Wullar Barrage/Tulbul Navigational Project a) History of the Dispute b) Arguments of the Parties and their Critique<br/>C) Baglihar Dam a) History of the Dispute b) Did Pakistan Seize the World Bank Belatedly?<br/>D) Appointment of the Neutral Expert d) Pakistan's Objections e) Point Counter Point i) India's Arguments ii) Pakistan's Arguments F) Neutral Expert's Determination and Its Critique g) Why Did Pakistan Lose the Case?<br/>G) Allegation of Stealing Pakistan's Water<br/>Chapter 6 Treaty in Action-II<br/>A) Kishenganga Dam a) History of the Dispute b) Point Counterpoint i) Pakistan's Arguments ii) India's Arguments c) Partial Award and Court's Reasoning d) Final Award and Court's Reasoning e) Critique of the Award<br/>B) Nimoo Bazgo and Chutak Dams a) Basic Facts b) India Claims Carbon Credits c) Controversy about Jamaat Ali Shah<br/>C) Restructuring Governmental Water-Related Machinery<br/>Chapter 7: Treaty and Climate Change<br/>A) Is Climate Change Real?<br/>B) South Asia and Climate Change<br/>C) Climate Change and Indus Rivers<br/>Chapter 8: Treaty in Trouble<br/>A) Terrorism as Grounds for Termination<br/>B) Rebus Sic Stantibus as Grounds for Termination<br/>C) Kashmiri Concerns as Grounds for Termination<br/>D) Unfairness as Grounds for Renegotiations<br/>E) India's Motive for Revisiting the Treaty<br/>F) India's Water Diplomacy with its South Asian Neighbours a) Nepal i) Kosi Agreement ii) Gandak Agreement iii) Tanakpur Agreement iv) Mahakali Treaty b) Bangladesh i) Farakka Barrage Agreement ii) Teesta River Dispute<br/>Conclusion<br/>Bibliography<br/>A) Official Documents a) General b) World Bank-Related Documents<br/>B) Books and Reports<br/>C) Periodical Literature<br/>D) Newspaper Articles<br/>E) Case Law a) General b) Baglihar and Kishenganga<br/>F) Pakistan's TV Talk Shows (Available on the Internet)<br/>G) Interviews or Correspondence with Water Experts<br/>Appendix 1: Inter-Dominion Agreement<br/>Appendix 2: Text of Indus Waters Treaty<br/>Appendix 3: Details of Projects by India on Western Rivers<br/>A) River Chenab a) Commissioned Projects b) Location c) Under Active Consideration and Power Potential d) Locations of Possible Diversions<br/>B) River Jhelum a) Commissioned Projects b) Location c) Power Potential<br/>C) River Indus a) Commissioned/Under Construction Projects b) Location c) Power Potential<br/>D) Rivers Common with Afghanistan a) Common Rivers in Khyber Pakhtunkhwa b) Common Rivers in Balochistan c) Average Annual Inflows d) Location Map of Ongoing/Proposed Projects by Pakistan e) Projects in Afghanistan<br/>E) Wullar Barrage and Storage Project/Tulbul Navigation Project a) Location<br/>F) Location Map of Baglihar HEP<br/>a) Location b) Salient Features<br/>G) Kishenganga Hydroelectric Plant a) Kishenganga Hydroelectric Plant on River Neelum b) Composite Map of Kishenganga, Wullar, LJHP, 544 URI-I, and URI-II<br/>Appendix 4: Western Rivers Inflow at Rim-Stations (MAF)<br/>Index
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Water resources development
Geographic subdivision India.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Water resources development
Geographic subdivision Pakistan.
651 #0 - SUBJECT ADDED ENTRY--GEOGRAPHIC NAME
Geographic name Indus River
General subdivision Water rights.
906 ## - LOCAL DATA ELEMENT F, LDF (RLIN)
a 7
b cbc
c origode
d 3
e ncip
f 20
g y-gencatlg
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type BOOKs
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Materials specified (bound volume or other part) Damaged status Not for loan Home library Current library Shelving location Date acquired Source of acquisition Coded location qualifier Total Checkouts Full call number Barcode Date last seen Date last checked out Price effective from Koha item type
    Dewey Decimal Classification HB     NLS NLS General Stacks 11/03/2018 Purchased MPPSECTION 3 346.046 HUS 36077 09/07/2026 02/07/2026 11/03/2019 BOOKs