

| Item type | Current library | Status | Barcode | |
|---|---|---|---|---|
|
|
NLS | Not for loan | MPP058 |
CONTENTS
DECLARATION;
CERTIFICATE;
ABSTRACT;
CONTENTS;
ABBREVIATIONS;
LIST OF FIGURES;
LIST OF TABLES;
ACKNOWLEDGEMENT;
CHAPTER 1 INTRODUCTION;
1.1 Background;
1.2 Research Questions;
1.3 Research objectives;
1.4 Scope of the Research;
1.5 Limitations of the Study;
1.6 Chapter Plan;
CHAPTER 2 LITERATURE REVIEW;
2.1 Introduction;
2.2 Legal and Institutional Framework;
2.2 Karnataka Solar Rooftop Policy 2014-2021;
CHAPTER 3; THEORETICAL FRAMEWORK;
3.1 Introduction 3.2 Systems Approach;
3.3 Operational Definitions of Variables;
3.4 Dependant Variable;
3.5 Independent Variable;
3.6 Indicators;
CHAPTER 4 RESEARCH METHODOLOGY;
4.1 Research Design;
4.2 Research Method;
4.3 Study Population and Place of Study;
4.4 Mysuru City Corporation Structure;
4.5 Sample Size;
4.6 Sources of Data;
4.6.1 Questionnaire Survey; 4.6.2 Interview;
4.7 Data Analysis;
CHAPTER 5 DATA PRESENTATION AND ANALYSIS;
5.1 Introduction;
5.2 Role of Karnataka Solar Policy;
5.3 Time and Cost Factor;
5.4 Interpretation;
5.5 Institutional Factors;
5.5.1 Human Resources;
5.5.2 Infrastructure;
5.5.3 Capacity Building;
5.5.4 Interpretation;
5.6 Citizen Factors;
5.6.1Interpretation;
5.7 Role of ICT Data monitoring;
5.7.1 Interpretation;
5.8 Conclusion;
CHAPTER 6 SUMMARY AND CONCLUSION;
6.1 Summary;
6.2 Conclusion;
6.2.1 Implications for further Research;
ANNEXURE;
Questions for Citizen Beneficiaries;
Questions for persons involved in solar implementation;
Interview Guide;
REFERENCES.